This is the rolling chassis. I had already prepared the jag. front and rear ends so it only took about an afternoon to bolt them onto the chassis along with the rack and pinion. |
|
Here, the 302W dinosaur power plant is coupled to the Toyota Supra 5 spd. box and bolted onto the chassis. The brake lines are also fitted at this stage. |
|
The photos have taken a bit of a jump here. The cobra has been completely fitted out previously and then stripped for painting. Here it is covered in 2pak primer to seal the fibre glass. |
|
Now it starts to look a bit more like a car with a coat of green metallic paint. |
|
I have made a cold air box to enclose the air filter so that it only breathes cold dense air instead of hot air from the radiator. |
Build time was 12 months. It went well and the side pipes sounded excellent !
Great for setting off car alarms as you blast by.
HOME
|
|
This page was last updated 15/11/07